Irrigation Three Phase - Rate 23

Effective April 1, 2009

Available to all three phase consumers for irrigation pumps including center pivot systems and pumps used for crop irrigation by the flooding method.

Single phase, 60 cycles, at available voltage, through a demand meter.

The monthly rate shall be:

Service Availability Charge: None
Demand Charge at $9.00 per kW
First 1,250 kWh at $0.1799 per kWh
Over 1,250 kWh at $0.1029 per kWh

The minimum monthly charge shall be $25.00.

Billing demand is the average demand in kilowatts for the 15 minutes of greatest power use during any one month as measured by a demand meter. Consumers will be billed only for actual demand measured by the meter for each month the service is used. The 11-month ratchet demand shall NOT apply to this rate schedule.